Market Notices

105653POWER SYSTEM EVENTS06/02/2023 09:39:29 AM

Non-credible contingency event - Qld Region - 03/02/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - Qld Region - 03/02/2023

At 1722 hrs 03/02/2023 the Kareeya Power Station Unit 1, Unit 2 and Unit 4 tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
105423RESERVE NOTICE31/01/2023 07:44:10 PM

Cancellation of Actual (LOR2) condition in the QLD region - 31/01/2023

AEMO ELECTRICITY MARKET NOTICE

The Actual LOR2 Condition in the QLD Region advised in AEMO Electricity Market Notice No.105421 is cancelled at 1940 hrs 31/01/2023.

Manager NEM Real Time Operations
105421RESERVE NOTICE31/01/2023 07:16:51 PM

Actual Lack Of Reserve Level 2 (LOR2) in the QLD Region on 31/01/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the QLD region - 31/01/2023

An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1900 hrs.

The Actual LOR2 condition is forecast to exist until 1930 hrs.

The forecast capacity reserve requirement is 500 MW.
The minimum capacity reserve available is 440 MW.

AEMO is seeking an immediate market response.

An insufficient market response may require AEMO to implement an AEMO intervention event.

Manager NEM Real Time Operations
104357POWER SYSTEM EVENTS11/12/2022 01:34:36 PM

Update - Non-credible contingency event - Vic region - 11/12/2022

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - Vic region - 11/12/2022

Refer AEMO ELECTRICITY MARKET NOTICE 104353

At 1157 hrs the Kerang - Wemen - Red Cliffs 220 kV Line and the Kiamal Solar Farm STX transformer (Kiamal synchronous condenser) tripped.

AEMO did not instruct load shedding.

AEMO has been advised of disconnection of bulk electrical load (27 MW)

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
104353POWER SYSTEM EVENTS11/12/2022 01:11:07 PM

Non-credible contingency event - Vic region - 11/12/2022

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - Vic region - 11/12/2022

At 1157 hrs the Kerang - Wemen - Red Cliffs 220 kV Line and the Kiamal Solar Farm STX transformer (Kiamal synchronous condenser) tripped.

AEMO did not instruct load shedding.

AEMO is still waiting to be advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations
103961POWER SYSTEM EVENTS25/11/2022 08:32:50 PM

Update - Vulnerable lines in Qld region

AEMO ELECTRICITY MARKET NOTICE.

Update - Lightning vulnerable lines in Qld region

Refer to AEMO Electricity Market Notice 103958 and 103959

At 1913 hrs Chalumbin - Turkinje No.7165 132 kV and Chalumbin - Turkinje No.7166 132 kV Lines tripped and auto-reclosed.
The cause of the trip was identified as due to lightning.
In accordance with SO_OP_3715, AEMO now considers the Chalumbin - Turkinje No.7165 132 kV and Chalumbin - Turkinje No.7166 132 kV lines to be vulnerable with a category of probable due to lightning.

Manager NEM Real Time Operations
103958POWER SYSTEM EVENTS25/11/2022 07:40:37 PM

Non-credible contingency event - Qld region - 25/11/2022

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - Qld region - 25/11/2022

At 1913 hrs the Chalumbin - Turkinje 7165 and 7166 132 kV Lines tripped and auto-reclosed.

AEMO did not instruct load shedding.

Approximately 75 MW of load was interrupted during the auto-reclose time.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
103900POWER SYSTEM EVENTS23/11/2022 06:29:16 PM

Update - Non-credible contingency event - SA region - 12/11/2022

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - SA region - 12/11/2022

Refer AEMO ELECTRICITY MARKET NOTICE 103066

At 1803 hrs 19/11/2022, Tailem Bend - South East No 1 275 kV Line was returned to service.

At 1805 hrs 23/11/2022, Tailem Bend - South East No 2 275kV Line was returned to service.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
103664POWER SYSTEM EVENTS19/11/2022 07:10:59 PM

Update - Significant power system event - 12/11/2022

AEMO ELECTRICITY MARKET NOTICE.

Update - Significant power system event - 12/11/2022

Refer AEMO Electricity Notice 103067

At 1803 hrs 19/11/2022, Tailem Bend - South East No 1 275 kV Line was returned to service

South Australia is now re-synchronised with the Eastern NEM.

The following constraints sets have been revoked at 1840 hrs;
SA_ESTN_LG_ISLE
SA_ISLE_LB_FFR_ZERO
F-SA_ESTN_ISLE_REG
S-X_BC_CP

Refer to AEMO Network Outage Schedule for further information.

Manager NEM Real Time Operations