Review of marginal loss factor calculation processes (2024)
AEMO has upgraded its software for calculating marginal loss factors (MLFs), presenting it with an opportunity to update its Methodology for the Calculation and Application of Forward-Looking Loss Factors (FLLFs). This methodology is subject to the standard rules consultation procedures described in clause 8.9.2 of the National Electricity Rules (NER). AEMO completed formal consultation in December 2024 on updates to the methodology reflecting the new software capability.
The scope of the methodology consultation is limited by the NER. Stakeholders are encouraged to provide feedback on the MLF calculation process that lies outside the scope of the methodology consultation to MLF_Feedback@aemo.com.au. AEMO has developed a register of this type of feedback that can be updated with further stakeholder input. AEMO has convened an MLF Discussion Forum to consider these sorts of issues. The first workshop for this forum was held on 30 October 2024 and the second workshop was held on 22 January 2025.
-
11/03/2025
Discussion Forum Workshop 2
1.31 MB -
11/03/2025
MLF change strawman list
491.77 KB -
13/01/2025
Discussion Forum Workshop 1 reflections
295.19 KB -
13/11/2024
Discussion Forum Workshop 1
790.23 KB -
05/07/2024
MLF regulatory discussion points register v1.0
418.31 KB -
03/06/2024
FLLF Methodology Review Pre-Consultation Workshops
949.35 KB
Historical Comparison
AEMO has published the backcast results covering the 2023-24 FY, including commentary on the primary drivers of variation. Stakeholders may contact AEMO at MLF_Feedback@aemo.com.au with any queries associated with this publication.