88318MARKET INTERVENTION17/07/2021 05:00:21 PM

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region 13/07/2021

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region 13/07/2021

Refer Market Notices 88122

The AEMO Intervention Event and all associated directions are cancelled from 1700 hrs 17/07/2021

Manager NEM Real Time Operations
88315MARKET INTERVENTION17/07/2021 04:20:47 PM

Cancellation - Possible intervention to manage power system security in South Australia (SA) region

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Possible intervention to manage power system security in South Australia (SA) region

Refer Market Notice 88288

AEMO no longer foresees a possible requirement for intervention to manage power system security in SA region. The advice of possible intervention is cancelled from 1600 hrs 17/07/2021.

Manager NEM Real Time Operations
88313RESERVE NOTICE17/07/2021 04:07:52 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region beginning on 19/07/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 conditions in the QLD region advised in AEMO Electricity Market Notice No. 88304 have been updated at 1400 hrs 17/07/2021 to the following:

1. From 1730 hrs 19/07/2021 to 1930 hrs 19/07/2021.
The forecast capacity reserve requirement is 720 MW.
The minimum capacity reserve available is 507 MW.

2. From 1730 hrs 20/07/2021 to 2000 hrs 20/07/2021.
The forecast capacity reserve requirement is 720 MW.
The minimum capacity reserve available is 430 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
88312RESERVE NOTICE17/07/2021 04:02:09 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region beginning on 19/07/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 conditions in the QLD region advised in AEMO Electricity Market Notice No. 88285 have been updated at 1400 hrs 17/07/2021 to the following:

1. From 0700 to 0730 hrs 19/07/2021.
The forecast capacity reserve requirement is 1163 MW.
The minimum capacity reserve available is 1015 MW.

2. From 1700 to 1730 hrs 19/07/2021.
The forecast capacity reserve requirement is 1163 MW.
The minimum capacity reserve available is 1117 MW.

3. From 1930 to 2030 hrs 19/07/2021.
The forecast capacity reserve requirement is 1163 MW.
The minimum capacity reserve available is 835 MW.

4. From 2000 to 2100 hrs 20/07/2021.
The forecast capacity reserve requirement is 1163 MW.
The minimum capacity reserve available is 783 MW.

5. From 1800 to 1900 hrs 21/07/2021.
The forecast capacity reserve requirement is 1085 MW.
The minimum capacity reserve available is 879 MW.

6. From 1800 to 1930 hrs 22/07/2021.
The forecast capacity reserve requirement is 1163 MW.
The minimum capacity reserve available is 1033 MW.

Manager NEM Real Time Operations
88311RESERVE NOTICE17/07/2021 03:53:18 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region beginning on 19/07/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 conditions in the NSW region advised in AEMO Electricity Market Notice No. 88286 have been updated at 1400 hrs 17/07/2021 to the followings:

1. From 2000 hrs to 2030 hrs 19/07/2021.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1391 MW.

2. From 1730 hrs to 2000 hrs 20/07/2021.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 851 MW.

3. From 1730 hrs to 1900 hrs 21/07/2021.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 953 MW.

4. From 1800 hrs to 1930 hrs 22/07/2021.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1290 MW.

Manager NEM Real Time Operations
88310RESERVE NOTICE17/07/2021 03:52:26 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region 19/07/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 conditions in the NSW region advised in AEMO Electricity Market Notice No. 88305 have been updated at 1400 hrs 17/07/2021 to the following:

1. From 1700 hrs 19/07/2021 to 2000 hrs 19/07/2021.
The forecast capacity reserve requirement is 1552 MW.
The minimum capacity reserve available is 554 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
88309NON-CONFORMANCE17/07/2021 01:15:17 PM

NON-CONFORMANCE Region QLD1 Saturday, 17 July 2021

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Saturday, 17 July 2021

AEMO declared a schedule generating unit non-conforming

Unit: OAKEY1SF
Duration: 17/07/2021 11:05 to 17/07/2021 13:15
Amount: -18 MW
Constraint: NC-Q_OAKEY1SF

Auto-generated on behalf of Manager NEM Real Time Operations
88308GENERAL NOTICE17/07/2021 12:25:11 PM

Cancellation : Non-credible contingency event more likely to occur due to existence of abnormal condition/s - SA region.

AEMO ELECTRICITY MARKET NOTICE.

Abnormal conditions advised in AEMO Electricity Market Notice 88263 have ceased to impact the likelihood of a non-credible event occurring as at 1225 hrs 17/07/2021

Manager NEM Real Time Operations
88307RECLASSIFY CONTINGENCY17/07/2021 12:26:48 PM

Cancellation of the reclassification of a Non-Credible Contingency Cancellation of the reclassification of a Non-Credible Contingency Event: Para-Templers West and Magill-Torrens Island A 275kV lines in SA due to severe weather warning.

AEMO ELECTRICITY MARKET NOTICE.

Cancellation of the reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.

AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any severe weather warning in the vicinity of the following lines. Accordingly, its classification has reverted to a non-credible contingency event.

Region: SA

Lines: Para-Templers West and Magill-Torrens Island A 275kV lines

Cancellation time: 1215 hrs 17/07/2021

Constraint set(s) revoked: Nil

Refer AEMO Electricity Market Notice 88218

Manager NEM Real Time Operations