Market Notices

86680MARKET INTERVENTION05/06/2021 05:18:37 PM

Direction - SA region 05/06/2021

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA region 05/06/2021

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1705 hrs on 05/06/2021.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
86677RECLASSIFY CONTINGENCY05/06/2021 02:35:20 PM

Reclassification of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV

Duration: 05/06/2021 14:35 until further notice

Constraint set(s) invoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1


Auto-generated on behalf of Manager NEM Real Time Operations
86676MARKET INTERVENTION05/06/2021 02:33:57 PM

Update - Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Update - Possible intervention to manage power system security in South Australia (SA) Region

The combination of synchronous generating units currently expected to be synchronised in SA from 0030 hrs 06/06/2021 in Pre-dispatch will not provide sufficient system strength in SA to maintain the power system in a secure operating state.

In the absence of sufficient market response AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised from 0030 hrs 06/06/2021 to maintain power system security in SA. Refer to current Transfer Limit Advice for SA system strength on the AEMO website.

AEMO estimates the latest time at which AEMO would need to intervene is 1700 hrs on 05/06/2021.

Manager NEM Real Time Operations
86675RESERVE NOTICE05/06/2021 02:24:56 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 10/06/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period[s]:

[1.] From 1930 hrs 10/06/2021 to 2000 hrs 10/06/2021.
The forecast capacity reserve requirement is 878 MW.
The minimum capacity reserve available is 869 MW.

Manager NEM Real Time Operations
86674MARKET INTERVENTION05/06/2021 02:58:32 PM

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 04/06/2021

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 04/06/2021

Refer Market Notice 86607

The AEMO Intervention Event and all associated directions are cancelled from 1500 hrs 05/06/20211

Manager NEM Real Time Operations
86672SETTLEMENTS RESIDUE05/06/2021 08:25:22 AM

[EventId:202106050825_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 05 June 2021 08:25

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0825 hrs on 5 June 2021

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 June 2021.

Refer to market notice: 86671

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.

The negative residue constraint NRM_QLD1_NSW1 ceased operating at 0825 hrs on 5 June 2021.

This is an AEMO autogenerated Market Notice.
86671SETTLEMENTS RESIDUE05/06/2021 07:10:26 AM

[EventId:202106050710_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 05 June 2021 07:10

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0710 hrs on 5 June 2021

ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 June 2021.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.

The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 0710 hrs on 5 June 2021.

This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
86670PRICES UNCHANGED05/06/2021 05:39:13 AM

[EventId:202106050515_confirmed] Prices for interval 05-Jun-2021 05:15 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0535 hrs on 5 June 2021

PRICES ARE NOW CONFIRMED for dispatch interval 05-Jun-2021 05:15.

In accordance with Market Notice 86659 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
86669PRICES UNCHANGED05/06/2021 05:37:36 AM

[EventId:202106050535_confirmed] Prices for interval 05-Jun-2021 05:35 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0535 hrs on 5 June 2021

PRICES ARE NOW CONFIRMED for dispatch interval 05-Jun-2021 05:35.

In accordance with Market Notice 86664 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm