53404PRICES UNCHANGED18/05/2016 11:36:36 PM

[EventId:201605182335_confirmed] Prices for interval 18-May-2016 23:35 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2336 hrs on 18 May 2016

PRICES ARE NOW CONFIRMED for dispatch interval 18-May-2016 23:35.

In accordance with Market Notice 53402 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
53403PRICES SUBJECT TO REVIEW18/05/2016 11:35:19 PM

[EventId:201605182340_review] Prices for interval 18-May-2016 23:40 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2335 hrs on 18 May 2016

PRICES ARE SUBJECT TO REVIEW for dispatch interval 18-May-2016 23:40.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
53402PRICES SUBJECT TO REVIEW18/05/2016 11:30:12 PM

[EventId:201605182335_review] Prices for interval 18-May-2016 23:35 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2330 hrs on 18 May 2016

PRICES ARE SUBJECT TO REVIEW for dispatch interval 18-May-2016 23:35.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
53401INTER-REGIONAL TRANSFER18/05/2016 05:14:33 AM

Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control

AEMO ELECTRICITY MARKET NOTICE

Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 18 May 2016

Refer MN 53400

The Tarong to South Pine (832) 275kV Line has been returned to service.

The following constraint set was revoked at 0540 hrs..

Q-TRSP_832

The constraint set contains equations with the following interconnectors on the LHS.

N-Q-MNSP1


Manager NEM Real Time Operations
53400INTER-REGIONAL TRANSFER18/05/2016 03:03:57 AM

Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 18 May 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 18 May 2016

The Tarong to South Pine (832) 275kV Line has been de-energised to manage voltages in the Qld region.

The following constraint set was invoked at 0310 hrs until further notice.

Q-TRSP_832

The constraint set contains equations with the following interconnectors on the LHS.

N-Q-MNSP1


Manager NEM Real Time Operations
53399INTER-REGIONAL TRANSFER17/05/2016 02:57:25 PM

Inter-Regional Transfer Limit Variation - Directlink - NSW Region 17 May 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer Limit Variation - Directlink - NSW Region - 17 May 2016

The planned outage of the DC2 pole of Directlink was scheduled to complete at 1700 hrs 18/05/16.

The outage has completed early

The following constraint set for this outage was revoked at 1455 hrs.
N-X_MBTE_2

The constraint set contains the following interconnector on the left hand side:
N-Q-MNSP1

See AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
53398MARKET SYSTEMS17/05/2016 02:47:51 PM

Planned System Maintenance - Electricity MMS Production - Bay Transfer

Change Number: CHG0038121

Notification issued to: Market Notice


Notification Type: Completed

Change Type: Normal

Service/ Component: Electricity Market Management System

Change Title: Planned System Maintenance - Electricity MMS Production - Bay Transfer

Change Description:
Transfer completed successfully

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.


Trevor fox
AEMO Supporthub
53397RESERVE NOTICE17/05/2016 03:07:21 PM

RESERVE NOTICE MT PASA PUBLICATION 17 May 2016

AEMO ELECTRICITY MARKET NOTICE

The MT PASA RELIABILITY_LRC results published on 17 May 2016 forecast shows low reserve conditions (LRC) in South Australia for Summer 2016-17 and Summer 2017-18. AEMO will continue to monitor the situation and take appropriate actions, if necessary.

The MT PASA results for the next 12 months are summarised at:
http://www.aemo.com.au/Electricity/Data/Forecast-Supply-and-Demand/Medium-Term-Outlook

This notice supersedes Market Notice 53118 published on 10 May 2016.

Please find the following information on some key inputs used in MT PASA:

Static minimum reserve levels (MRLs) have been specified for QLD, NSW and TAS regions as follows:

QLD: 913 MW
NSW: -1564 MW
TAS: 144 MW

The following optimum shared minimum reserve levels between Victoria and South Australia regions have been specified:

VIC Reserve >= 205.00
5.88 * VIC Reserve + SA Reserve >= 1237.88
1.33 * VIC Reserve + SA Reserve >= 228.00
0.43 * VIC Reserve + SA Reserve >= -40.53
0.23 * VIC Reserve + SA Reserve >= -147.55
SA Reserve >= -368.00

In order to remain consistent with the calculation of the minimum reserve levels, the following interconnector headroom constraints (net import/export limit constraints) have also been applied in MT PASA:

QLD: 0 MW of maximum net import into QLD.
NSW: 330 MW of minimum net export from NSW.
VIC: 940MW of maximum net import into VIC.
SA: 0 MW of maximum net import into SA.

Demand Side Participation included in MT PASA are:

Summer: QLD 156 MW, NSW 422 MW, VIC 245 MW, SA 167 MW and TAS 73 MW

Winter: QLD 156 MW, NSW 422 MW, VIC 185 MW, SA 167 MW and TAS 73 MW

Supply Planning
AEMO
53396PRICES UNCHANGED17/05/2016 08:17:26 AM

[EventId:201605170820_confirmed] Prices for interval 17-May-2016 08:20 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0817 hrs on 17 May 2016

PRICES ARE NOW CONFIRMED for dispatch interval 17-May-2016 08:20.

In accordance with Market Notice 53394 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.