Inter regional transfer limit variation SA - 12 July 2016
Inter regional transfer limit variation SA - 12 July 2016
Due to continuing bad weather in the SA region a number of SA outages have been impacted.
The outages have been extended by approximately 24 hrs
The following constraint set is invoked for these outages
S-TB_275KV_W_BUS
The outage constraints contain the following interconnectors on the LHS
NSW1-QLD1
V-S-MNSP1
V-SA
Refer to AEMO Network Outage Scheduler (NOS) for updated times.
Manager NEM Real Time Operations
Inter regional transfer limit variation SA - 11 July 2016
Inter regional transfer limit variation SA - 11 July 2016
Due to high winds in the SA region a number of SA outages have been impacted.
The outages have been extended by approximately 27 hrs
The following constraint set is invoked for these outage
S-TB_275KV_W_BUS
The outage constraints contain the following interconnectors on the LHS
NSW1-QLD1
V-S-MNSP1
V-SA
Refer to AEMO Network Outage Scheduler (NOS) for updated times.
Manager NEM Real Time Operations
Inter-regional transfer limit variation VIC - 11 July 2016
Inter-regional transfer limit variation VIC - 11 July 2016
An outage of Moorabool - South Morang 500 kV Line in the VIC region required an update of the outage constraints.
The following constraint set is invoked for this outage
CA_SPS_46954420
The outage constraints contain the following interconnectors on the LHS
V-S-MNSP1
VIC1-NSW1
T-V-MNSP1
V-SA
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Inter-regional transfer limit variation: Hazelwood - South Morang No.1 500kV Line (VIC) - Voltage Control - Sunday, 10th July 2016
Inter-regional transfer limit variation: Hazelwood - South Morang No.1 500kV Line (VIC) - Voltage Control - Sunday, 10th July 2016
Refer AEMO Electricity Market Notice 54388
The Hazelwood - South Morang No.1 500kV Line has been returned to service in the Victoria region.
The following constraint set was revoked at 0835 hrs
V-HWSM
The constraint set contains equations with the following interconnectors on the LHS.
NSW1-QLD1
T-V-MNSP1
V-S-MNSP1
V-SA
VIC1-NSW1
Manager NEM Real Time Operations
Inter-regional transfer limit variation: Hazelwood - South Morang No.1 500kV Line (VIC) - Voltage Control
Inter-regional transfer limit variation: Hazelwood - South Morang No.1 500kV Line (VIC) - Voltage Control - Sunday, 10th July 2016
The Hazelwood - South Morang No.1 500kV Line has been de-energised to manage voltages in the VIC region.
The following constraint set was invoked at 0340 hrs
V-HWSM
The constraint set contains equations with the following interconnectors on the LHS.
NSW1-QLD1
T-V-MNSP1
V-S-MNSP1
V-SA
VIC1-NSW1
Refer to AEMO Network Outage Schedule for further details and return to service times
Manager NEM Real Time Operations
Inter-regional transfer limit variation South Australia - 04 July 2016
Inter-regional transfer limit variation South Australia - 04 July 2016
A short notice outage of the Templers No.2 132 kV Transformer in the SA region has occurred at 0955 hrs.
The following constraint set has been invoked for this outage at 1005 hrs
S-X_TPRS+TPDR
The outage constraint set contains the following interconnector on the LHS
V-S-MNSP1
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Lismore SVC - NSW Region - Sun 3 July 2016
Inter-regional transfer limit variation - Lismore SVC - NSW Region - Sun 3 July 2016
At 2247 hrs, an unplanned outage of the Lismore SVC occured.
The following constraint set was invoked from 2255 hrs.
N-LS_VC1
The constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
NSW1_QLD1
See Network Outage Scheduler (NOS) for further details and return to service times.
Manager NEM Real Time Operations
Inter-regional transfer limit variation George Town - Sheffield No2 220kV line (TAS)
Inter-regional transfer limit variation George Town - Sheffield No.2 220kV line (TAS).
An unplanned notice outage of the George Town - Sheffield No.2 220kV line (TAS) occurred at 0802 hrs Sunday, 3 July 2016.
Constraint Set T-GTSH invoked at 0810 hrs.
This Constraint Set contains an equation with the following interconnector on the LHS.
T-V-MNSP1
Refer to the Network Outage Schedule (NOS) for further details.
Power System Operations Manager
Inter-Regional Transfer Limit Variation New South Wales Region Friday, 1 July 2016 Directlink
Inter-Regional Transfer Limit Variation New South Wales Region Friday, 1 July 2016 Directlink
An unplanned outage of the No 2 Leg of Directlink has occurred at 1859 hrs
See AEMO Network Outage Scheduler (NOS) for details.
The following constraint set is invoked for this outage from 1905 hrs
N-X_MBTE_2
The outage constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1