54472SETTLEMENTS RESIDUE13/07/2016 11:30:15 AM

[EventId:201607131130_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 13 July 2016 11:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1130 hrs on 13 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 13 July 2016.

Refer to market notice: 54468

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 1130 hrs on 13 July 2016.

This is an AEMO autogenerated Market Notice.
54468SETTLEMENTS RESIDUE13/07/2016 10:30:24 AM

[EventId:201607131030_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 13 July 2016 10:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1030 hrs on 13 July 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 13 July 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.

The negative residue constraint set NRM_SA1_VIC1 commenced operating from 1030 hrs on 13 July 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
54467SETTLEMENTS RESIDUE13/07/2016 10:00:19 AM

[EventId:201607131000_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 13 July 2016 10:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1000 hrs on 13 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 13 July 2016.

Refer to market notice: 54466

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 1000 hrs on 13 July 2016.

This is an AEMO autogenerated Market Notice.
54466SETTLEMENTS RESIDUE13/07/2016 09:00:28 AM

[EventId:201607130900_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 13 July 2016 09:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0900 hrs on 13 July 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 13 July 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.

The negative residue constraint set NRM_SA1_VIC1 commenced operating from 0900 hrs on 13 July 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
54460RESERVE NOTICE12/07/2016 07:44:57 PM

Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016

Manager NEM Real Time Operations

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016

The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No 54458 is cancelled at 1930 hrs Tuesday, 12 July 2016.


Manager NEM Real Time Operations

54458RESERVE NOTICE12/07/2016 07:04:33 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.

An Actual LOR1 condition has been declared for the South Australia Region.

From 1830 hrs to 1930 hrs Tuesday, 12 July 2016

The contingency capacity reserve required is 400 MW

The minimum reserve available is 224 MW


Manager NEM Real Time Operations


54457SETTLEMENTS RESIDUE12/07/2016 07:00:23 PM

[EventId:201607121900_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 12 July 2016 19:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1900 hrs on 12 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Refer to market notice: 54455

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 1900 hrs on 12 July 2016.

This is an AEMO autogenerated Market Notice.
54455SETTLEMENTS RESIDUE12/07/2016 06:00:29 PM

[EventId:201607121800_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 12 July 2016 18:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1800 hrs on 12 July 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.

The negative residue constraint set NRM_SA1_VIC1 commenced operating from 1800 hrs on 12 July 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
54452SETTLEMENTS RESIDUE12/07/2016 04:30:19 PM

[EventId:201607121630_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 12 July 2016 16:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1630 hrs on 12 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Refer to market notice: 54442

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 1630 hrs on 12 July 2016.