Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control
Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 20 May 2016
Refer Market Notice 53435
The Tarong to South Pine (832) 275kV Line has been returned to service.
The following constraint set was revoked at 0535 hrs..
Q-TRSP_832
The constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
Cancellation - Inter-regional Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control
Cancellation - Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control - Monday, 16 May 2016
Refer to Market Notice 53437
The Greenbank to Middle Ridge (8849) 275kV Line was returned to service.
The following constraint set was revoked at 0505 hrs.
Q-MRGB_8848_8849
The constraint set contains equations with the following interconnectors on the LHS.
NSW-QLD1
N-Q-MNSP1
Manager NEM Real Time Operations
Inter-regional Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control
Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control - 20 May 2016
The Greenbank to Middle Ridge (8849) 275kV Line has been de-energised to manage voltages in the Qld region.
The following constraint set was invoked at 0225 hrs until further notice.
Q-MRGB_8848_8849
The constraint set contains equations with the following interconnectors on the LHS.
NSW-QLD1
N-Q-MNSP1
Manager NEM Real Time Operations
Inter-regional transfer limit variation for Transient Stability Limit - Vic Region - 20 May 2016
Inter-regional transfer limit variation for Transient Stability Limit - Vic Region - 20 May 2016
The AEMO Dynamic Stability Analysis application is indicating violations for a fault on a Hazelwood - South Morang 500 kV transmission line in the Victoria region.
The following constraints have been invoked to apply offset reductions to the Victoria transient stability export limit.
Constraint V-DSA_STAB-050 invoked from 0215 hrs until further notice
Constraints have the following interconnectors on the LHS
NSW1-QLD1
T-V-MNSP1
V-S-MNSP1
V-SA
VIC1-NSW1
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 20 May 2016
Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 20 May 2016
The Tarong to South Pine (832) 275kV Line has been de-energised to manage voltages in the Qld region.
The following constraint set was invoked at 0115 hrs until further notice.
Q-TRSP_832
The constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control
Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 18 May 2016
Refer MN 53400
The Tarong to South Pine (832) 275kV Line has been returned to service.
The following constraint set was revoked at 0540 hrs..
Q-TRSP_832
The constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 18 May 2016
Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 18 May 2016
The Tarong to South Pine (832) 275kV Line has been de-energised to manage voltages in the Qld region.
The following constraint set was invoked at 0310 hrs until further notice.
Q-TRSP_832
The constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
Inter-Regional Transfer Limit Variation - Directlink - NSW Region 17 May 2016
Inter-Regional Transfer Limit Variation - Directlink - NSW Region - 17 May 2016
The planned outage of the DC2 pole of Directlink was scheduled to complete at 1700 hrs 18/05/16.
The outage has completed early
The following constraint set for this outage was revoked at 1455 hrs.
N-X_MBTE_2
The constraint set contains the following interconnector on the left hand side:
N-Q-MNSP1
See AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Cancellation - Inter-regional Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control
Cancellation - Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control - Monday, 16 May 2016
Refer to MN 53307
The Greenbank to Middle Ridge (8849) 275kV Line was returned to service.
The following constraint set was revoked at 0530 hrs until further notice.
Q-MRGB_8848_8849
The constraint set contains equations with the following interconnectors on the LHS.
NSW-QLD1
N-Q-MNSP1
Manager NEM Real Time Operations