STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 01/07/2025
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127741 has been updated at 1400 hrs 24/06/2025 to the following:
1. From 1100 hrs to 1130 hrs 01/07/2025.
The forecast capacity reserve requirement is 404 MW.
The minimum capacity reserve available is 377 MW.
2. From 1600 hrs to 1630 hrs 01/07/2025.
The forecast capacity reserve requirement is 410 MW.
The minimum capacity reserve available is 301 MW.
AEMO Operations
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 127740
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 1400 hrs 25/06/2025.
The direction update is issued at 1600 hrs 24/06/2025.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 30/06/2025
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127739 has been updated at 1400 hrs 24/06/2025 to the following:
1. From 0600 hrs to 0700 hrs 30/06/2025.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 473 MW.
2. From 1030 hrs to 1100 hrs 30/06/2025.
The forecast capacity reserve requirement is 376 MW.
The minimum capacity reserve available is 268 MW.
3. From 1630 hrs to 1700 hrs 30/06/2025.
The forecast capacity reserve requirement is 397 MW.
The minimum capacity reserve available is 200 MW.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 30/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
1. From 0630 hrs to 0830 hrs 30/06/2025.
The forecast capacity reserve requirement is 1558 MW.
The minimum capacity reserve available is 1123 MW.
2. From 1630 hrs to 2300 hrs 30/06/2025.
The forecast capacity reserve requirement is 1558 MW.
The minimum capacity reserve available is 1073 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/06/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127738 has been updated at 1400 hrs 24/06/2025 to the following:
1. From 0600 hrs to 0800 hrs 26/06/2025.
The forecast capacity reserve requirement is 1748 MW.
The minimum capacity reserve available is 1714 MW.
2. From 1630 hrs to 2300 hrs 26/06/2025.
The forecast capacity reserve requirement is 1859 MW.
The minimum capacity reserve available is 1636 MW.
AEMO Operations
Cancellation - Direction - NSW region - 23/06/2025
Cancellation - Direction - NSW region - 23/06/2025
Refer to Market Notice 127745.
The requirement for AEMO to issue a direction to maintain the power system in a secure operating state has ended. All associated directions are cancelled from 1907hrs on 23/06/2025.
Manager NEM Real Time Operations
Direction - NSW region 23/06/2025
Direction - NSW region 23/06/2025
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the NSW region.
The direction was necessary to maintain the power system in a secure operating state.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided.
A further market notice will be issued when all directions related to this requirement have been cancelled.
For the purposes of the National Electricity Rules this was a clause 4.8.9 instruction under clause 4.8.9(a).
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 01/07/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
From 0230 hrs to 0400 hrs 01/07/2025.
The forecast capacity reserve requirement is 460 MW.
The minimum capacity reserve available is 230 MW.
AEMO Operations
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 127696
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 25/06/2025.
The direction update is issued at 1500 hrs 23/06/2025.
Manager NEM Real Time Operations