Update - Foreseeable AEMO intervention in SA region
Update - Foreseeable AEMO intervention in SA region
Refer AEMO Electricity Market Notice 127672
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0900 hrs 21/06/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1600 hrs 20/06/2025, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0900 hrs 21/06/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
NON-CONFORMANCE Region VIC1 Friday, 20 June 2025
NON-CONFORMANCE VIC1 Region Friday, 20 June 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: YWPS4
Duration: 20/06/2025 01:50 to 20/06/2025 02:10
Amount: -37 MW
Constraint: NC-V_YWPS4
Auto-generated on behalf of Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 19/06/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127651 is cancelled at 1400 hrs 18/06/2025.
No LOR condition is currently forecast in the STPASA period.
AEMO Operations
NON-CONFORMANCE Region QLD1 Wednesday, 18 June 2025
NON-CONFORMANCE QLD1 Region Wednesday, 18 June 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_1
Duration: 18/06/2025 14:25 to 18/06/2025 14:40
Amount: -55 MW
Constraint: NC-Q_MPP_1
Auto-generated on behalf of Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 19/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
1. From 0600 hrs to 0800 hrs 19/06/2025.
The forecast capacity reserve requirement is 1558 MW.
The minimum capacity reserve available is 1420 MW.
2. From 1630 hrs to 2300 hrs 19/06/2025.
The forecast capacity reserve requirement is 1558 MW.
The minimum capacity reserve available is 1487 MW.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 18/06/2025
The Forecast LOR1 condition in the VIC region advised in AEMO Electricity Market Notice No. 127645 is cancelled at 1412 hrs 17/06/2025.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 18/06/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127638 is cancelled at 1412 hrs 17/06/2025.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 18/06/2025
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127646 is cancelled at 1411 hrs 17/06/2025.
Manager NEM Real Time Operations