PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 18/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 1800 hrs 18/06/2025 to 1930 hrs 18/06/2025.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 508 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 18/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following Period:
[1.] From 1800 hrs 18/06/2025 to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 1166 MW.
The minimum capacity reserve available is 1069 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 18/06/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Periods:
[1.] From 1700 hrs 18/06/2025 to 1730 hrs 18/06/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1305 MW.
[2.] From 1900 hrs 18/06/2025 to 2030 hrs 18/06/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 955 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 18/06/2025 to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 938 MW.
The minimum capacity reserve available is 812 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Planned outage of Moorabool - Cressy No 1 500 kV line in the VIC region on 19/06/2025
The Moorabool - Cressy No 1 500 kV line in the Victoria (VIC) region is planned to be out of service from 0600 hrs to 1700 hrs on 19/06/2025.
A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM.
During this planned outage:
* Power transfer will be restricted across the VIC - SA interconnector (Heywood interconnector); and
* Post contingent FCAS will be sourced within SA following Separation event.
Refer AEMO Network Outage Schedule (NOS) for further details.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1730 hrs to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 1047 MW.
The minimum capacity reserve available is 957 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 127604 is cancelled at 1700 hrs 16/06/2025.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 18/06/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
1. From 0700 hrs to 0830 hrs 18/06/2025.
The forecast capacity reserve requirement is 1086 MW.
The minimum capacity reserve available is 896 MW.
2. From 1630 hrs to 1700 hrs 18/06/2025.
The forecast capacity reserve requirement is 1128 MW.
The minimum capacity reserve available is 922 MW.
3. From 1730 hrs to 1900 hrs 18/06/2025.
The forecast capacity reserve requirement is 1167 MW.
The minimum capacity reserve available is 1135 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 17/06/2025
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127599 is cancelled at 1410 hrs 16/06/2025.
Manager NEM Real Time Operations