Update - Foreseeable AEMO intervention in SA region
Update - Foreseeable AEMO intervention in SA region
Refer AEMO Electricity Market Notice 128015
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2200 hrs 09/07/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1600 hrs 09/07/2025, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 08/07/2025
Cancellation - AEMO Intervention Event - SA region 08/07/2025
Refer to Market Notice 128006
The AEMO Intervention Event and all associated directions are cancelled from 0730 hrs on 09/07/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 128012
Direction is cancelled from: 0730 hrs 09/07/2025
Manager NEM Real Time Operations
[EventId:202507081830_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 08 July 2025 18:30
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 8 July 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 July 2025.
Refer to market notice: 128028
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1830 hrs on 8 July 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202507081730_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 08 July 2025 17:30
Issued by Australian Energy Market Operator Ltd at 1730 hrs on 8 July 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 July 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1730 hrs on 8 July 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2200 hrs 09/07/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 08/07/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 08/07/2025 to 1800 hrs 08/07/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1392 MW.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 128007
The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 0730 hrs 09/07/2025.
The direction update is issued at 1445 hrs 08/07/2025.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 06/07/2025
Cancellation - AEMO Intervention Event - SA region 06/07/2025
Refer to Market Notice 127966
The AEMO Intervention Event and all associated directions are cancelled from 1500 hrs on 08/07/2025.
Manager NEM Real Time Operations