Market Notices

127857NON-CONFORMANCE25/06/2025 03:45:12 PM

NON-CONFORMANCE Region QLD1 Wednesday, 25 June 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Wednesday, 25 June 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: TARONG#4
Duration: 25/06/2025 15:35 to 25/06/2025 15:45
Amount: -50 MW
Constraint: NC-Q_TARONG#4

Auto-generated on behalf of Manager NEM Real Time Operations
     
127856SETTLEMENTS RESIDUE25/06/2025 03:35:15 PM

[EventId:202506251535_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 25 June 2025 15:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1535 hrs on 25 June 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 25 June 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1535 hrs on 25 June 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
127852NON-CONFORMANCE25/06/2025 02:45:13 PM

NON-CONFORMANCE Region VIC1 Wednesday, 25 June 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE VIC1 Region Wednesday, 25 June 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: LVES1
Duration: 25/06/2025 14:25 to 25/06/2025 14:45
Amount: 63 MW
Constraint: NC-V_LVES1

Auto-generated on behalf of Manager NEM Real Time Operations
     
127851NON-CONFORMANCE25/06/2025 02:40:13 PM

NON-CONFORMANCE Region QLD1 Wednesday, 25 June 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Wednesday, 25 June 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: ULPBESS1
Duration: 25/06/2025 14:25 to 25/06/2025 14:40
Amount: 6 MW
Constraint: NC-Q_ULPBESS1

Auto-generated on behalf of Manager NEM Real Time Operations
     
127847RESERVE NOTICE25/06/2025 02:48:13 PM

STPASA - Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 02/07/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR3 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:

1. From 0630 hrs to 1100 hrs 02/07/2025.
The maximum load (other than interruptible loads) forecast to be interrupted is 108 MW at 0800 hrs.

2. From 1700 hrs 02/07/2025 to 0000 hrs 03/07/2025.
The maximum load (other than interruptible loads) forecast to be interrupted is 153 MW at 1900 hrs.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
127846RESERVE NOTICE25/06/2025 01:44:52 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 26/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 127842 is cancelled at 1345 hrs 25/06/2025.

Manager NEM Real Time Operations
     
127845RESERVE NOTICE25/06/2025 01:44:05 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/06/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127841 is cancelled at 1345 hrs 25/06/2025.

Manager NEM Real Time Operations
     
127842RESERVE NOTICE25/06/2025 12:54:52 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 26/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Periods:


[1.] From 1000 hrs 26/06/2025 to 1030 hrs 26/06/2025.
The forecast capacity reserve requirement is 430 MW.
The minimum capacity reserve available is 416 MW.


[2.] From 1430 hrs 26/06/2025 to 1600 hrs 26/06/2025.
The forecast capacity reserve requirement is 437 MW.
The minimum capacity reserve available is 373 MW.


[3.] From 1730 hrs 26/06/2025 to 2200 hrs 26/06/2025.
The forecast capacity reserve requirement is 435 MW.
The minimum capacity reserve available is 354 MW.


Manager NEM Real Time Operations
     
127841RESERVE NOTICE25/06/2025 12:54:22 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/06/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:


[1.] From 1730 hrs 26/06/2025 to 1900 hrs 26/06/2025.
The forecast capacity reserve requirement is 1784 MW.
The minimum capacity reserve available is 1698 MW.


Manager NEM Real Time Operations
     