Update - Foreseeable AEMO intervention in SA region
Update - Foreseeable AEMO intervention in SA region
Refer AEMO Electricity Market Notice 127075
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 1130 hrs 17/05/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1600 hrs 16/05/2025, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0830 hrs 17/05/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 15/05/2025
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 127067 is cancelled at 1410 hrs 15/05/2025.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 16/05/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1730 hrs 16/05/2025 to 1800 hrs 16/05/2025.
The forecast capacity reserve requirement is 1216 MW.
The minimum capacity reserve available is 1201 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/05/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127043 is cancelled at 1740 hrs 13/05/2025.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/05/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 13/05/2025 to 1800 hrs 13/05/2025.
The forecast capacity reserve requirement is 1385 MW.
The minimum capacity reserve available is 1070 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/05/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127025 is cancelled at 1645 hrs 13/05/2025.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/05/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 14/05/2025 to 1800 hrs 14/05/2025.
The forecast capacity reserve requirement is 1385 MW.
The minimum capacity reserve available is 1366 MW.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 12/05/2025
Cancellation - AEMO Intervention Event - SA region 12/05/2025
Refer to Market Notice 127002
The AEMO Intervention Event and all associated directions are cancelled from 0800 hrs on 13/05/2025.
Manager NEM Real Time Operations