Cancellation - Possible intervention to manage power system security in South Australia (SA) region 18/04/2025
Cancellation - Possible intervention to manage power system security in South Australia (SA) region 18/04/2025
Refer Market Notice 126581
AEMO no longer foresees a possible requirement for intervention to manage power system security in SA region. The advice of possible intervention is cancelled from 1445 hrs 17/04/2025.
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0830 hrs 18/04/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
Update - Non-credible contingency event - QLD region - 16/04/2025
Update - Non-credible contingency event - QLD region - 16/04/2025
Refer AEMO Electricity Market Notice 126579
At 1231 hrs the Greenbank - Molendinar 8825 275kV line was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - QLD region - 16/04/2025
Refer market notice: 126577
Non-credible contingency event - QLD region - 16/04/2025
At 2110 hrs the Greenbank - Molendinar 8825 275kV line tripped at the Molendinar end only.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Greenbank - Molendinar 8825 275kV line - QLD region - 16/04/2025
Inter-regional transfer limit variation - Greenbank - Molendinar 8825 275kV line - QLD region - 16/04/2025
At 2110 hrs 16/04/2025 there was an unplanned outage of Greenbank - Molendinar 8825 275kV line.
The following constraint set(s) invoked at 2120 hrs 16/04/2025
Q-GBMO_8824_8825
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 15/04/2025
Cancellation - AEMO Intervention Event - SA region 15/04/2025
Refer to Market Notice 126540
The AEMO Intervention Event and all associated directions are cancelled from 1330 hrs on 15/04/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 126562
Direction is cancelled from: 1330 hrs 15/04/2025
Manager NEM Real Time Operations
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 126541
PPCCGT PELICAN POINT at 0730 hrs 15/04/2025 to Remain synchronised and follow dispatch targets.
The PPCCGT PELICAN POINT direction is expected to stay in place until 1330 hrs 15/04/2025.
The direction update is issued at 0030 hrs 15/04/2025.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 14/04/2025
Cancellation of Actual (LOR1) condition in the NSW region - 14/04/2025
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.126559 is cancelled at 1811 hrs 14/04/2025.
Manager NEM Real Time Operations