Filter by category
Filter by Date
Update - Non-credible contingency event - VIC region - 03/11/2023
Update - Non-credible contingency event - VIC region - 03/11/2023
Refer AEMO Electricity Market Notice 110687
At 0845 hrs the Mount Beauty No.2 220kV bus was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - VIC region - 03/11/2023
Non-credible contingency event - VIC region - 03/11/2023
At 0412 hrs the Mount Beauty No.2 220kV bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the SA region - 27/10/2023
Cancellation of Actual (LOR2) condition in the SA region - 27/10/2023
The Actual LOR2 Condition in the SA Region advised in AEMO Electricity Market Notice No.110559 is cancelled at 2015 hrs 27/10/2023.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the SA region - 27/10/2023
Actual Lack Of Reserve Level 2 (LOR2) in the SA region - 27/10/2023
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1930 hrs.
The Actual LOR2 condition is not forecast in Pre Dispatch
The capacity reserve required is 480 MW
The minimum reserve available is 465 MW
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement a AEMO intervention event.
Manager NEM Real Time Operations
Non-credible contingency event - TAS region - 21/10/2023
Non-credible contingency event - TAS region - 21/10/2023
At 2029 hrs the Wadamana Tungatina No.1 and No.2 line tripped and auto reclosed.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Update - Non-credible contingency event - QLD region - 21/10/2023
Update - Non-credible contingency event - QLD region - 21/10/2023
Refer AEMO Electricity Market Notice 110340
At 0208 hrs the Ross No 2 275kV Bus was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Update Non-credible contingency event - QLD region - 21/10/2023
Update Non-credible contingency event - QLD region - 21/10/2023
Refer to market notice 110339.
At 0133 hrs the Ross No 2 275kV Bus tripped.
AEMO did not instruct load shedding.
AEMO has been advised of disconnection of 218 MW bulk electrical load.
The 132kV network between Clare South and Tully has been disconnected
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Non-credible contingency event - QLD region - 21/10/2023
Non-credible contingency event - QLD region - 21/10/2023
At 0133 hrs the Ross No 2 275kV Bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Non-credible contingency event - VIC region - 19/10/2023
Non-credible contingency event - VIC region - 19/10/2023
At 1437 hrs the Moorabool No.2 500kV bus tripped
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations