Filter by category
Filter by Date
Actual Lack Of Reserve Level 3 (LOR3) in the South Australia Region - Wednesday, 8 February 2017.
Actual Lack Of Reserve Level 3 (LOR3) in the South Australia Region - Wednesday, 8 February 2017.
Under the NER Cl 4.8.4(d), AEMO considers that Customer load is actually being interrupted in order to maintain or restore the security of the power system in South Australia Region.
An Actual LOR3 condition has been declared for the South Australia region from 1803 hrs.
The Actual LOR3 condition is forecast to exist until 1930 hrs
The maximum load is being interrupted is 100 MW at 1803 hrs Wednesday, 8 February 2017
Manager NEM Real Time Operations