54306RESERVE NOTICE07/07/2016 06:12:30 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 07 July 2016

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 07 July 2016
An Actual LOR1 condition has been declared for the SA Region from 1815 hrs.

The Actual LOR1 condition is forecast to exist until 2130 hrs

The contingency capacity reserve required is 400 MW

The reserve available is 277 MW

Manager NEM Real Time Operations
54248RESERVE NOTICE06/07/2016 07:15:35 PM

Cancellation of the Actual (LOR1) condition in the SA region - 6/7/2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 6/7/2016

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.54247 is cancelled at 1900 hrs 6/7/2016.


Manager NEM Real Time Operations
54247RESERVE NOTICE06/07/2016 06:15:46 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 06 July 2016

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 06 July 2016
An Actual LOR1 condition has been declared for the SA Region from 1800 hrs.

The Actual LOR1 condition is forecast to exist until 1930 hrs (or is not forecast in Pre Dispatch)

The contingency capacity reserve required is 400 MW

The minimum reserve available is 337 MW


Manager NEM Real Time Operations
54224RECLASSIFY CONTINGENCY05/07/2016 08:35:17 PM

Cancellation of the Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.

Refer AEMO Electricity Market Notice 54223

There is no longer any lightning activity in the vicinity of the Rowville - Yallourn No.5 & No.6 220 kV Lines.

AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 2030 hrs.

Constraint Set

V-ROYP56_R_N-2 revoked.


Manager NEM Real Time Operations
54223RECLASSIFY CONTINGENCY05/07/2016 06:44:00 PM

Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.

Lightning is occurring near the Rowville - Yallourn No.5 & No.6 220 kV Lines.

AEMO considers the simultaneous trip of those circuits to now be more likely.

Therefore AEMO has reclassified this as a credible contingency event from 1845 hrs 5/07/2016 until further notice.

Constraint Set

V-ROYP56_R_N-2 invoked.


Manager NEM Real Time Operations
54127RECLASSIFY CONTINGENCY24/06/2016 02:58:23 PM

Cancellation of the Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.

Refer AEMO Electricity Market Notice 54126

There is no longer any lightning activity in the vicinity of the Rowville - Yallourn No.5 & No.6 220 kV Lines.

AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1500 hrs.

Constraint Set

V-ROYP56_R_N-2 revoked.


Manager NEM Real Time Operations
54126RECLASSIFY CONTINGENCY24/06/2016 02:20:51 PM

Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.

Lightning is occurring near the Rowville - Yallourn No.5 & No.6 220 kV Lines.

AEMO considers the simultaneous trip of those circuits to now be more likely.

Therefore AEMO has reclassified this as a credible contingency event from 1425 hrs 24/06/16 until further notice.

Constraint Set

V-ROYP56_R_N-2 invoked.


Manager NEM Real Time Operations
54123RECLASSIFY CONTINGENCY24/06/2016 12:44:44 AM

Cancellation of the Reclassification of a Non-Credible Contingency Event: Eildon - Mt. Beauty No. 1 and No. 2 220 kV Lines in Victoria due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Reclassification of a Non-Credible Contingency Event: Eildon - Mt. Beauty No. 1 and No. 2 220 kV Lines in Victoria due to Lightning.
Refer AEMO Electricity Market Notice 54120
There is no longer any lightning activity in the vicinity of the Eildon - Mt. Beauty No. 1 and No. 2 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 0030 hrs.

Manager NEM Real Time Operations

54122RECLASSIFY CONTINGENCY24/06/2016 12:43:28 AM

Cancellation of the Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 and No.3 220 kV Lines in Victoria due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 and No.3 220 kV Lines in Victoria due to Lightning.
Refer AEMO Electricity Market Notice 54119
There is no longer any lightning activity in the vicinity of the Dederang - Glenrowan No.1 and No.3 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 0030 hrs.
Constraint Set V-DDGN_N-2 revoked.

Manager NEM Real Time Operations