Filter by category
Filter by Date
[EventId:201801191545_NRM_VIC1_NSW1_stopped] NEGRES CONSTRAINT NRM_VIC1_NSW1 ceased operating from 19 January 2018 15:45
Issued by Australian Energy Market Operator Ltd at 1545 hrs on 19 January 2018
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 19 January 2018.
Refer to market notice: 60851
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to NSW directional interconnector.
The negative residue constraint NRM_VIC1_NSW1 ceased operating at 1545 hrs on 19 January 2018.
This is an AEMO autogenerated Market Notice.
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the VIC Region on 19/01/2018
The Forecast LOR2 condition in the VIC region advised in AEMO Electricity Market Notice No. 60845 is cancelled at 1530 hrs 19/01/2018.
No LOR2 condition is currently forecast in the PDPASA period.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Friday, 19 January 2018
NON-CONFORMANCE QLD1 Region Friday, 19 January 2018
AEMO declared a schedule generating unit non-conforming
Unit: TARONG#3
Duration: 19/01/2018 15:30 to 19/01/2018 15:40
Amount: 35 MW
Constraint: NC-Q_TARONG#3
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:201801191530_NRM_VIC1_NSW1_started] NEGRES CONSTRAINT NRM_VIC1_NSW1 started operating from 19 January 2018 15:30
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 19 January 2018
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 19 January 2018.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to NSW directional interconnector.
The negative residue constraint set NRM_VIC1_NSW1 commenced operating from 1530 hrs on 19 January 2018.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201801191500_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 19 January 2018 15:00
Issued by Australian Energy Market Operator Ltd at 1500 hrs on 19 January 2018
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 19 January 2018.
Refer to market notice: 60848
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1500 hrs on 19 January 2018.
This is an AEMO autogenerated Market Notice.
Update - Actual Lack Of Reserve Level 1 (LOR1) in the VIC Region - 19/01/2018
Update - Actual Lack Of Reserve Level 1 (LOR1) in the VIC Region - 19/01/2018
An Actual LOR1 condition has been declared for the VIC Region from 1320 hrs.
The Actual LOR1 condition is forecast to exist until 1800 hrs
The contingency capacity reserve required is 1120 MW
The current actual reserve level is 979 MW
Manager NEM Real Time Operations
[EventId:201801191430_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 19 January 2018 14:30
Issued by Australian Energy Market Operator Ltd at 1430 hrs on 19 January 2018
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 19 January 2018.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1430 hrs on 19 January 2018.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Actual Lack Of Reserve Level 1 (LOR1) in the VIC Region - 19/01/2018
Actual Lack Of Reserve Level 1 (LOR1) in the VIC Region - 19/01/2018
An Actual LOR1 condition has been declared for the VIC Region from 1320 hrs.
The Actual LOR1 condition is forecast to exist until 1800 hrs
The contingency capacity reserve required is 1120 MW
The minimum reserve available is 32 MW
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the SA Region on 19/01/2018
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 60838 has been updated at 1130 hrs 19/01/2018 to the following:
From 1500 hrs to 1630 hrs on 19/01/2018
The contingency capacity reserve required is 350 MW.
The minimum reserve available is 32 MW.
AEMO is seeking a market response.
AEMO determines the latest time at which they would need to intervene through an AEMO intervention event is 1400 hrs on 19/01/2018
Manager NEM Real Time Operations