Market Notices

60840MARKET INTERVENTION19/01/2018 11:22:37 AM

INTENTION TO COMMENCE RERT CONTRACT NEGOTIATIONS


AEMO ELECTRICITY MARKET NOTICE.

Reliability and Emergency Reserve Trader (RERT) Intention to negotiate for additional reserve- VIC Region- Friday, 19 January 2018

Refer to AEMO Electricity Market Notice no. 60837

AEMO intends to commence negotiations with RERT Panel members for the provision of additional reserve by issuing requests for tender for the following period of time;

1400 hrs to 1700 hrs 19/01/2018

Manager NEM Real Time Operations


60839INTER-REGIONAL TRANSFER19/01/2018 11:05:45 AM

Inter-Regional Transfer limit variation - Terranora (NSW Region)

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Terranora (NSW Region)

AEMO has been notified that the controls to vary Directlink output are unavailable until further notice.

The Constraint Set I-CTRL_ISSUE_TE was invoked from 1050 hrs 19/01/2018

This Constraint Set contains equations with the following interconnector on the LHS.

N-Q-MNSP1

Manager NEM Real Time Operations
60838RESERVE NOTICE19/01/2018 11:09:48 AM

PDPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the SA Region on 19/01/2018


AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 60834 has been updated at 1100 hrs 19/01/2018 to the following:

From 1430 hrs to 1630 hrs on 19/01/2018



The contingency capacity reserve required is 350 MW.

The minimum reserve available is 157 MW.

AEMO is seeking a market response.

AEMO determines the latest time at which they would need to intervene through an AEMO intervention event is 1200 hrs on 19/01/2018

Manager NEM Real Time Operations
60837RESERVE NOTICE19/01/2018 11:10:10 AM

PDPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the VIC Region on 19/01/2018


AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the VIC region advised in AEMO Electricity Market Notice No. 60833 has been updated at 1100 hrs 19/01/2018 to the following:

From 1430 hrs to 1700 hrs on 19/01/2018

The contingency capacity reserve required is 560 MW.
The minimum reserve available is 157 MW.

AEMO is seeking a market response.

AEMO determines the latest time at which they would need to intervene through an AEMO intervention event is 1200 hrs on 19/01/2018

Manager NEM Real Time Operations
60836RESERVE NOTICE19/01/2018 08:39:21 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on Friday, 19 January 2018


AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the VIC region advised in AEMO Electricity Market Notice No. 60828 has been updated at 0830 hrs 19/01/2018 to the following:
From 1300 hrs to 1730 hrs on 19/01/2018.
The contingency capacity reserve required is 1100 MW.
The minimum reserve available is 287 MW.

Manager NEM Real Time Operations


60835RESERVE NOTICE19/01/2018 08:34:52 AM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region 19/01/2018


AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

From 1400 hrs to 1730 hrs on 19/01/2018.
The contingency capacity reserve required is 600 MW.
The minimum reserve available is 287 MW.


Manager NEM Real Time Operations
60834RESERVE NOTICE19/01/2018 08:27:34 AM

PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region Friday 19th January 2018

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the SA region for the following period:

From 1530 hrs 19/01/2018 to 1600 hrs on 19/01/2018.
The contingency capacity reserve required is 350 MW.
The minimum reserve available is 287 MW.
AEMO is seeking a market response.
AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event

Manager NEM Real Time Operations


60833RESERVE NOTICE19/01/2018 08:27:43 AM

PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the VIC Region Friday 19th January 2018


AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the VIC region for the following period:

From 1400 hrs 19/01/2018t o 1700 hrs on 19/01/2018.
The contingency capacity reserve required is 560 MW.
The minimum reserve available is 287 MW.
AEMO is seeking a market response.
AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
60832PRICES UNCHANGED19/01/2018 06:39:45 AM

[EventId:201801190640_confirmed] Prices for interval 19-Jan-2018 06:40 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0639 hrs on 19 January 2018

PRICES ARE NOW CONFIRMED for dispatch interval 19-Jan-2018 06:40.

In accordance with Market Notice 60830 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm