54945NON-CONFORMANCE22/09/2016 10:05:12 AM

NON-CONFORMANCE Region QLD1 Thursday, 22 September 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Thursday, 22 September 2016

AEMO declared a schedule generating unit non-conforming

Unit: KAREEYA1
Duration: 22/09/2016 09:30 to 22/09/2016 10:05
Amount: -12 MW
Constraint: NC-Q_KAREEYA1

Auto-generated on behalf of Manager NEM Real Time Operations
54944NON-CONFORMANCE22/09/2016 12:40:13 AM

NON-CONFORMANCE Region QLD1 Thursday, 22 September 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Thursday, 22 September 2016

AEMO declared a schedule generating unit non-conforming

Unit: TARONG#1
Duration: 22/09/2016 00:35 to 22/09/2016 00:40
Amount: 19 MW
Constraint: NC-Q_TARONG#1

Auto-generated on behalf of Manager NEM Real Time Operations
54943NON-CONFORMANCE22/09/2016 12:15:16 AM

NON-CONFORMANCE Region QLD1 Thursday, 22 September 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Thursday, 22 September 2016

AEMO declared a schedule generating unit non-conforming

Unit: TARONG#1
Duration: 22/09/2016 00:10 to 22/09/2016 00:15
Amount: 21 MW
Constraint: NC-Q_TARONG#1

Auto-generated on behalf of Manager NEM Real Time Operations
54942RESERVE NOTICE21/09/2016 03:26:39 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the SA Region for 22 Sep 2016

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 54937 for 22/09/2016 is cancelled at 1400 hrs 21/09/2016.

Tien Foong
AEMO Operations
54941NON-CONFORMANCE21/09/2016 01:25:10 PM

NON-CONFORMANCE Region VIC1 Wednesday, 21 September 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE VIC1 Region Wednesday, 21 September 2016

AEMO declared a schedule generating unit non-conforming

Unit: HWPS7
Duration: 21/09/2016 13:20 to 21/09/2016 13:25
Amount: -19 MW
Constraint: NC-V_HWPS7

Auto-generated on behalf of Manager NEM Real Time Operations
54940RESERVE NOTICE20/09/2016 03:12:32 PM

RESERVE NOTICE MT PASA PUBLICATION 20 SEPTEMBER 2016

AEMO ELECTRICITY MARKET NOTICE

The MT PASA RELIABILITY_LRC results published on 20 September 2016 forecast shows low reserve conditions (LRC) in South Australia for Summer 2016-17 and Summer 2017-18. The results also shows LRC in Queensland for Summer 2017-18. AEMO will continue to monitor the situation and take appropriate actions, if necessary.

The MT PASA results for the next 24 months are summarised at:
http://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data-dashboard#medium-term-outlook

This notice supersedes Market Notice 54898 published on 13 September 2016.

Please find the following information on some key inputs used in MT PASA:

Static minimum reserve levels (MRLs) have been specified for QLD, NSW and TAS regions as follows:

QLD: 913 MW
NSW: -1564 MW
TAS: 144 MW

The following optimum shared minimum reserve levels between Victoria and South Australia regions have been specified:

VIC Reserve >= 205.00
5.88 * VIC Reserve + SA Reserve >= 1237.88
1.33 * VIC Reserve + SA Reserve >= 228.00
0.43 * VIC Reserve + SA Reserve >= -40.53
0.23 * VIC Reserve + SA Reserve >= -147.55
SA Reserve >= -368.00

In order to remain consistent with the calculation of the minimum reserve levels, the following interconnector headroom constraints (net import/export limit constraints) have also been applied in MT PASA:

QLD: 0 MW of maximum net import into QLD.
NSW: 330 MW of minimum net export from NSW.
VIC: 940MW of maximum net import into VIC.
SA: 0 MW of maximum net import into SA.

Demand Side Participation included in MT PASA are:

Summer: QLD 147.5 MW, NSW 248.5 MW, VIC 141.8 MW, SA 120.2 MW and TAS 43 MW

Winter: QLD 147.5 MW, NSW 248.5 MW, VIC 85 MW, SA 120.2 MW and TAS 43 MW

Supply Planning
AEMO
54939NON-CONFORMANCE20/09/2016 02:45:15 PM

NON-CONFORMANCE Region QLD1 Tuesday, 20 September 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Tuesday, 20 September 2016

AEMO declared a schedule generating unit non-conforming

Unit: STAN-2
Duration: 20/09/2016 14:35 to 20/09/2016 14:45
Amount: 23 MW
Constraint: NC-Q_STAN-2

Auto-generated on behalf of Manager NEM Real Time Operations
54938NON-CONFORMANCE19/09/2016 10:05:18 PM

NON-CONFORMANCE Region TAS1 Monday, 19 September 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE TAS1 Region Monday, 19 September 2016

AEMO declared a schedule generating unit non-conforming

Unit: POAT220
Duration: 19/09/2016 22:00 to 19/09/2016 22:05
Amount: -24 MW
Constraint: NC-T_POAT220

Auto-generated on behalf of Manager NEM Real Time Operations
54937RESERVE NOTICE19/09/2016 02:50:17 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - 22 Sep 2016

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period.

From 22/09/2016 1900 hrs to 2000 hrs:

The contingency capacity reserve required is 400 MW.

The minimum reserve available is 363 MW.

Tien Foong
AEMO Operations