STPASA - Canellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the Victoria Region on 24/11/2017
The Forecast LOR2 condition in the Vic region advised in AEMO Electricity Market Notice No. 59957 is cancelled at 1600 hrs 21/11/2017.
No LOR2 condition is currently forecast in the STPASA period.
Harmohan Singh
AEMO Operations
NON-CONFORMANCE Region NSW1 Tuesday, 21 November 2017
NON-CONFORMANCE NSW1 Region Tuesday, 21 November 2017
AEMO declared a schedule generating unit non-conforming
Unit: MP1
Duration: 21/11/2017 15:00 to 21/11/2017 15:05
Amount: -65 MW
Constraint: NC-N_MP1
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Chalumbin - Turkinje No.7165 and No.7166 132kV lines in QLD due to lightning.
Reclassification of a non-credible contingency event as a credible contingency event due to lightning.
AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: QLD
Lines: Chalumbin - Turkinje No.7165 and No.7166 132kV lines
Duration: 21/11/2017 14:55 until further notice
Constraint set(s) invoked: Nil
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the Victoria Region 23 - 24 /11/2017
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the Vic region for the following periods:
1. From 1530 hrs to 1730 hrs on 23/11/2017.
The contingency capacity reserve required is 1154 MW.
The minimum reserve available is 953 MW.
2. From 1230 hrs to 1600 hrs on 24/11/2017.
The contingency capacity reserve required is 1154 MW.
The minimum reserve available is 747 MW.
Daniel Ghantous
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the Victoria Region on 24/11/2017
AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the Vic region for the following period:
From 1530 hrs to 1600 hrs on 24/11/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 592 MW.
AEMO is seeking a market response.
AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.
Daniel Ghantous
AEMO Operations
Reclassification of a Non-Credible Contingency Event: Eildon - Mt Beauty No. 1 and No. 2 220kV lines in VIC due to lightning.
Reclassification of a non-credible contingency event as a credible contingency event due to lightning.
AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: VIC
Lines: Eildon - Mt Beauty No. 1 and No. 2 220kV lines
Duration: 21/11/2017 13:40 until further notice
Constraint set(s) invoked: Nil
Manager NEM Real Time Operations
RESERVE NOTICE MT PASA PUBLICATION 21 November 2017
The MTPASA result published on 21 November 2017 shows Low Reserve Conditions (LRC) in South Australia for November 2017, Summer 2017-18, March 2018, Summer 2018-19 and March 2019, and in Victoria for November 2017, Summer 2017-18, March 2018, November 2018 and Summer 2018-2019. AEMO will continue to monitor the situation and take appropriate actions, if necessary.
To view the summary of MTPASA results for the next 24 months, visit AEMO's website at http://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data-dashboard and click on the 'Medium Term Outlook' tab.
This notice supersedes Market Notice 59898 published on 14 November 2017.
Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast capacity reserve conditions over a two year period.
AEMO may apply probabilistic studies such as Energy Adequacy Assessment Projection (EAAP) to confirm the LRC findings of MTPASA before intervening in the market.
For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at
http://www.aemo.com.au/-/media/Files/Stakeholder_Consultation/Consultations/Electricity_Consultations/2016/EAAP/Reliability-Standard-Implementation-Guidelines.pdf
Supply Forecasting
AEMO
Cancellation of a Non-Credible Contingency Event: Ross - Chalumbin No.857 and No.858 275kV lines in QLD due to lightning.
Cancellation of reclassification of a non-credible contingency event as a credible contingency event due to lightning.
AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD
Lines: Ross - Chalumbin No.857 and No.858 275kV lines
Cancellation time: 03:00 hrs 21/11/17
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 59952
Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Chalumbin - Turkinje No.7165 and No.7166 132kV lines in QLD due to lightning.
Cancellation of reclassification of a non-credible contingency event as a credible contingency event due to lightning.
AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD
Lines: Chalumbin - Turkinje No.7165 and No.7166 132kV lines
Cancellation time: 03:00 hrs 21/11/17
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 59951