Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region - PDPASA
Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region - PDPASA
AEMO declares a Forecast LOR1 condition for the New South Wales Region.
From 1430 hrs to 1600 hrs 06/02/17
The contingency capacity reserve required is 1400 MW
The minimum reserve available is 1380 MW
Manager NEM Real Time Operations
[EventId:201702051605_confirmed] Prices for interval 05-Feb-2017 16:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1604 hrs on 5 February 2017
PRICES ARE NOW CONFIRMED for dispatch interval 05-Feb-2017 16:05.
In accordance with Market Notice 57220 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201702051605_review] Prices for interval 05-Feb-2017 16:05 are subject to review
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 5 February 2017
PRICES ARE SUBJECT TO REVIEW for dispatch interval 05-Feb-2017 16:05.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Cancellation of the Forecast (LOR1) condition in the New South Wales region - PDPASA
Cancellation of the Forecast (LOR1) condition in the New South Wales region - PDPASA
The Forecast LOR1 condition in the New South Wales Region advised in AEMO Electricity Market Notice No. 57217 is cancelled at 1535 hrs 5/2/17
Manager NEM Real Time Operations
Market Reporting for Forecast Extreme Temperature - New South Wales 5/2/17
Market Reporting for Forecast Extreme Temperature
AEMO's weather service provider has issued a forecast temperature of 43 degrees for Bankstown New South Wales for today, 5/2/17
This forecast temperature exceeds the Reference Temperatures referred to in the AEMO System Operating Procedure SO_OP_3703 Short Term Reserve Management
AEMO requests Participants review their offered capacities based on the forecast temperature.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region - PDPASA
Refer Market notice 57216
Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region - PDPASA
AEMO declares a Forecast LOR1 condition for the New South Wales Region.
From 1430 hrs to 1600 hrs 06/02/17
The contingency capacity reserve required is 1400 MW
The minimum reserve available is 1297 MW
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region - STPASA
Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region - STPASA
AEMO declares a Forecast LOR1 condition for the New South Wales Region.
From 1430 hrs to 1500 hrs 06/02/17
The contingency capacity reserve required is 1400 MW
The minimum reserve available is 1394 MW
Manager NEM Real Time Operations
[EventId:201702032215_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 03 February 2017 22:15
Issued by Australian Energy Market Operator Ltd at 2215 hrs on 3 February 2017
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 3 February 2017.
Refer to market notice: 57214
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 2215 hrs on 3 February 2017.
This is an AEMO autogenerated Market Notice.
[EventId:201702032200_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 03 February 2017 22:00
Issued by Australian Energy Market Operator Ltd at 2200 hrs on 3 February 2017
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 3 February 2017.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 2200 hrs on 3 February 2017.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.