Market Notices

86498PRICES SUBJECT TO REVIEW03/06/2021 04:30:16 PM

[EventId:202106031635_review] Prices for interval 03-Jun-2021 16:35 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1630 hrs on 3 June 2021

PRICES ARE SUBJECT TO REVIEW for dispatch interval 03-Jun-2021 16:35.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
86497RECLASSIFY CONTINGENCY03/06/2021 04:19:07 PM

Cancellation of the reclassification of a Non-Credible contingency event: NSW Region - 21/05/2021.


AEMO ELECTRICITY MARKET NOTICE.

Cancellation of the reclassification of a Non-Credible contingency event as a Credible contingency event. AEMO considers the trip of the following transmission equipment is no longer reasonably possible. Accordingly its classification has reverted to a non-credible contingency event.

Region: NSW

Elements: Gadara 132 kV CB 9932

Cancellation time: 1600 hrs 03/06/2021

Constraint set(s) revoked:
Nil

Refer AEMO Electricity Market Notice 85739

Manager NEM Real Time Operations
86496SETTLEMENTS RESIDUE03/06/2021 03:30:33 PM

[EventId:202106031530_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 03 June 2021 15:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1530 hrs on 3 June 2021

ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 3 June 2021.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.

The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1530 hrs on 3 June 2021.

This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
86495RESERVE NOTICE03/06/2021 02:46:47 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the Qld Region on 03/06/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the Qld region for the following period:

From 1700 hrs to 2100 hrs 03/06/2021.
The forecast capacity reserve requirement is 878 MW.
The minimum capacity reserve available is 843 MW.

Manager NEM Real Time Operations
86494RESERVE NOTICE03/06/2021 02:26:57 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 03/06/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 86492 has been updated at 1425 hrs to the following:
From 1700 hrs to 1900 hrs 03/06/2021.
The contingency forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 964 MW.

Manager NEM Real Time Operations
86493RESERVE NOTICE03/06/2021 12:41:47 PM

Cancellation of Actual (LOR1) condition in the NSW region - 03/06/2021

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 03/06/2021

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.86490 is cancelled at 1240 hrs 03/06/2021.

Manager NEM Real Time Operations
86492RESERVE NOTICE03/06/2021 11:37:32 AM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 03/06/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

From 1730 hrs to 1830 hrs 03/06/2021.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1327 MW.

Manager NEM Real Time Operations
86491GENERAL NOTICE03/06/2021 10:48:32 AM

Daily planned outage of Heywood-Mortlake PS 500kV line in Victoria region on 21st, 22th, 23rd, 24th and 25th June 2021

AEMO ELECTRICITY MARKET NOTICE

This market notice is FOR INFORMATION ONLY.

Heywood-Mortlake PS 500kV line in Victoria Region is planned out of service on the following days.

-21/06/2021 on 0700hrs to 1800hrs
-22/06/2021 on 0700hrs to 1800hrs
-23/06/2021 on 0700hrs to 1800hrs
-24/06/2021 on 0700hrs to 1800hrs
-25/06/2021 on 0700hrs to 1800hrs

A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM. If separation occurs, load may be interrupted due to the operation of the Automatic Under Frequency Load Shedding (AUFLS) scheme in SA.

The credible separation contingency is managed as follows:

When power transfer is from SA to Victoria (Vic), contingency lower FCAS will be sourced from SA.
When power transfer is from Vic to SA, due to the 47-52Hz island separation frequency band advised by the SA jurisdiction, contingency raise FCAS is not sourced in SA and the AUFLS scheme may respond to low frequency events.
Power transfer will be restricted on Victoria - South Australia interconnector (Heywood interconnector).

Forecast capacity reserves in the SA region are currently sufficient to meet electricity demand during the planned outage.

The following constraint sets have been invoked for this outage:

I-VS_050
S-X_BC_CP
V-HYMO

Refer AEMO Network Outage Schedule (NOS) for further details.


AEMO Operations
86490RESERVE NOTICE03/06/2021 09:08:01 AM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 03/06/2021

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 03/06/2021

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 0910 hrs.
The Actual LOR1 condition is forecast to exist until 1200hrs.
The capacity reserve requirement is 1400 MW
The minimum capacity reserve available is 1250 MW

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm