Energy Price Limits
Current Energy Price Limits
Name | Units | From Date | Value |
Maximum STEM Price | $/MWh | 01/02/2023 | $324.00 |
Minimum STEM Price | $/MWh | 01/07/2012 | -$1000.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2023 | $738.00 |
Review of Energy Price Limits
From 1 July 2021, the ERA must review the appropriateness of the values of the Energy Price Limits each year and where required propose a change in the value of one of more of the price limits. Further information regarding the review and consultation can be found on the ERA website.
Links to historical reviews can be found below:
2020 Review of Energy Price Limits
2019 Review of Energy Price Limits
2018 Review of Energy Price Limits
2017 Review of Energy Price Limits
2016 Review of Energy Price Limits
2015 Review of Energy Price Limits
2014 Review of Energy Price Limits
2013 Review of Energy Price Limits
2012 Review of Energy Price Limits
2011 Review of Energy Price Limits
2010 Review of Energy Price Limits
2009 Review of Energy Price Limits
2008 Review of Energy Price Limits
2007 Review of Energy Price Limits
Historical Energy Price Limits
Name | Units | From Date | Until Date | Value |
---|---|---|---|---|
Maximum STEM Price | $/MWh | 01/02/2023 |
TBA | $324.00 |
Maximum STEM Price | $/MWh | 01/02/2022 | 01/02/2023 | $290.00 |
Maximum STEM Price | $/MWh | 01/09/2020 | 01/02/2022 | $267.00 |
Maximum STEM Price |
$/MWh |
01/08/2019 | 01/09/2020 | $235.00 |
Maximum STEM Price |
$/MWh |
01/07/2018 | 01/08/2019 | $302.00 |
Maximum STEM Price |
$/MWh |
01/10/2017 | 01/07/2018 | $351.00 |
Maximum STEM Price | $/MWh | 01/07/2016 | 01/10/2017 | $240.00 |
Maximum STEM Price | $/MWh | 01/07/2015 | 01/07/2016 | $253.00 |
Maximum STEM Price | $/MWh | 01/07/2014 | 01/07/2015 | $330.00 |
Maximum STEM Price | $/MWh | 01/07/2013 | 01/07/2014 | $305.00 |
Maximum STEM Price | $/MWh | 01/07/2012 | 01/07/2013 | $323.00 |
Maximum STEM Price | $/MWh | 01/11/2011 | 01/07/2012 | $314.00 |
Maximum STEM Price | $/MWh | 01/10/2010 | 01/10/2011 | $336.00 |
Maximum STEM Price | $/MWh | 01/10/2009 | 01/10/2010 | $276.00 |
Maximum STEM Price | $/MWh | 01/10/2008 | 01/10/2009 | $286.00 |
Maximum STEM Price | $/MWh | 01/11/2007 | 01/10/2008 | $206.00 |
Maximum STEM Price | $/MWh | 01/10/2007 | 01/11/2007 | $163.15 |
Maximum STEM Price | $/MWh | 01/10/2006 | 01/10/2007 | $159.84 |
Maximum STEM Price | $/MWh | 21/09/2006 | 01/10/2006 | $153.73 |
Minimum STEM Price | $/MWh | 01/07/2012 | TBA | -$1000.00 |
Minimum STEM Price | $/MWh | 01/11/2011 | 01/07/2012 | -$314.00 |
Minimum STEM Price | $/MWh | 01/10/2010 | 01/10/2011 | -$336.00 |
Minimum STEM Price | $/MWh | 01/10/2009 | 01/10/2010 | -$276.00 |
Minimum STEM Price | $/MWh | 01/10/2008 | 01/10/2009 | -$286.00 |
Minimum STEM Price | $/MWh | 01/11/2007 | 01/10/2008 | -$206.00 |
Minimum STEM Price | $/MWh | 01/10/2007 | 01/11/2007 | -$163.15 |
Minimum STEM Price | $/MWh | 01/10/2006 | 01/10/2007 | -$159.84 |
Minimum STEM Price | $/MWh | 21/09/2006 | 01/10/2006 | -$153.73 |
Maximum Shutdown Price | $/MW | 01/10/2006 | 01/10/2007 | $58.61 |
Maximum Shutdown Price | $/MW | 21/09/2006 | 01/10/2006 | $56.37 |
Alternative Maximum STEM Price | $/MWh |
01/08/2023 | 01/09/2023 | $743.00 |
Alternative Maximum STEM Price | $/MWh |
01/07/2023 |
01/08/2023 |
$770.00 |
Alternative Maximum STEM Price |
$/MWh |
01/06/2023 | 01/07/2023 | $805.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2023 | 01/06/2023 | $833.00 |
Alternative Maximum STEM Price |
$/MWh |
01/04/2023 | 01/05/2023 | $862.00 |
Alternative Maximum STEM Price |
$/MWh |
01/03/2023 |
01/04/2023 |
$927.00 |
Alternative Maximum STEM Price |
$/MWh |
01/02/2023 |
01/03/2023 | $989.00 |
Alternative Maximum STEM Price |
$/MWh |
01/01/2023 |
01/02/2023 | $1,010.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2022 | 01/01/2023 | $1,002.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2022 | 01/12/2022 | $1,018.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2022 | 01/11/2022 | $1,077.00 |
Alternative Maximum STEM Price | $/MWh |
01/09/2022 |
01/10/2022 | $1,102.00 |
Alternative Maximum STEM Price |
$/MWh | 01/08/2022 |
01/09/2022 | $1,057.00 |
Alternative Maximum STEM Price |
$/MWh | 01/07/2022 | 01/08/2022 | $969.00 |
Alternative Maximum STEM Price |
$/MWh |
01/06/2022 |
01/07/2022 |
$875.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2022 |
01/06/2022 |
$781.00 |
Alternative Maximum STEM Price |
$/MWh |
01/04/2022 |
01/05/2022 | $669.00 |
Alternative Maximum STEM Price |
$/MWh | 01/03/2022 | 01/04/2022 |
$635.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2022 | 01/03/2022 | $626.00 |
Alternative Maximum STEM Price |
$/MWh |
01/01/2022 |
01/02/2022 |
$553.00 |
Alternative Maximum STEM Price |
$/MWh |
01/12/2021 |
01/01/2022 | $532.00 |
Alternative Maximum STEM Price |
$/MWh |
01/11/2021 | 01/12/2021 | $511.00 |
Alternative Maximum STEM Price |
$/MWh |
01/10/2021 | 01/11/2021 | $502.00 |
Alternative Maximum STEM Price |
$/MWh | 01/09/2021 |
01/10/2021 | $491.00 |
Alternative Maximum STEM Price |
$/MWh |
01/08/2021 |
01/09/2021 | $468.00 |
Alternative Maximum STEM Price |
$/MWh |
01/07/2021 | 01/08/2021 | $465.00 |
Alternative Maximum STEM Price |
$/MWh |
01/06/2021 |
01/07/2021 | $456.00 |
Alternative Maximum STEM Price |
$/MWh |
01/05/2021 | 01/06/2021 | $443.00 |
Alternative Maximum STEM Price |
$/MWh |
01/04/2021 |
01/05/2021 |
$424.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2021 |
01/04/2021 | $403.00 |
Alternative Maximum STEM Price |
$/MWh |
01/02/2021 | 01/03/2021 | $388.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2021 | 01/02/2021 | $376.00 |
Alternative Maximum STEM Price |
$/MWh | 01/12/2020 | 01/01/2021 | $382.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2020 | 01/12/2020 | $391.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2020 | 01/11/2020 | $395.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2020 | 01/10/2020 | $383.00 |
Alternative Maximum STEM Price |
$/MWh |
01/08/2020 |
01/09/2020 |
$375.00 |
Alternative Maximum STEM Price |
$/MWh |
01/07/2020 |
01/08/2020 | $392.00 |
Alternative Maximum STEM Price |
$/MWh |
01/06/2020 |
01/07/2020 |
$441.00 |
Alternative Maximum STEM Price |
$/MWh | 01/05/2020 | 01/06/2020 | $511.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2020 | 01/05/2020 | $551.00 |
Alternative Maximum STEM Price |
$/MWh | 01/03/2020 | 01/04/2020 | $562.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2020 | 01/03/2020 | $562.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2020 | 01/02/2020 | $560.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2019 | 01/01/2020 | $560.00 |
Alternative Maximum STEM Price |
$/MWh |
01/11/2019 |
01/12/2019 | $556.00 |
Alternative Maximum STEM Price |
$/MWh |
01/10/2019 | 01/11/2019 | $551.00 |
Alternative Maximum STEM Price |
$/MWh |
01/09/2019 |
01/10/2019 | $560.00 |
Alternative Maximum STEM Price |
$/MWh |
01/08/2019 |
01/09/2019 | $565.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2019 | 01/08/2019 | $556.00 |
Alternative Maximum STEM Price |
$/MWh |
01/06/2019 |
01/07/2019 |
$545.00 |
Alternative Maximum STEM Price |
$/MWh |
01/05/2019 |
01/06/2019 | $529.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2019 | 01/05/2019 | $515.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2019 | 01/04/2019 | $527.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2019 | 01/03/2019 | $562.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2019 | 01/02/2019 | $587.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2018 | 01/01/2019 | $586.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2018 | 01/12/2018 | $567.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2018 | 01/11/2018 | $557.00 |
Alternative Maximum STEM Price |
$/MWh |
01/09/2018 | 01/10/2018 | $557.00 |
Alternative Maximum STEM Price |
$/MWh |
01/08/2018 |
01/09/2018 | $548.00 |
Alternative Maximum STEM Price |
$/MWh |
01/07/2018 | 01/08/2018 | $533.00 |
Alternative Maximum STEM Price |
$/MWh | 01/06/2018 | 01/07/2018 | $604.00 |
Alternative Maximum STEM Price |
$/MWh | 01/05/2018 | 01/06/2018 | $599.00 |
Alternative Maximum STEM Price |
$/MWh | 01/04/2018 | 01/05/2018 | $597.00 |
Alternative Maximum STEM Price |
$/MWh |
01/03/2018 | 01/04/2018 | $593.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2018 | 01/03/2018 | $579.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2018 | 01/02/2018 | $565.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2017 | 01/01/2018 | $548.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2017 | 01/12/2017 | $535.00 |
Alternative Maximum STEM Price |
$/MWh |
01/10/2017 | 01/11/2017 | $528.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2017 | 01/10/2017 | $391.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2017 | 01/09/2017 | $398.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2017 | 01/08/2017 | $404.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2017 | 01/07/2017 | $409.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2017 | 01/06/2017 | $413.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2017 | 01/05/2017 | $413.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2017 | 01/04/2017 | $401.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2017 | 01/03/2017 | $390.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2017 | 01/02/2017 | $379.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2016 | 01/01/2017 | $371.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2016 | 01/12/2016 | $367.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2016 | 01/11/2016 | $375.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2016 | 01/10/2016 | $380.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2016 | 01/09/2016 | $367.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2016 | 01/08/2016 | $346.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2016 | 01/07/2016 | $315.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2016 | 01/06/2016 | $307.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2016 | 01/05/2016 | $316.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2016 | 01/04/2016 | $345.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2016 | 01/03/2016 | $377.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2016 | 01/02/2016 | $396.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2015 | 01/01/2016 | $398.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2015 | 01/12/2015 | $407.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2015 | 01/11/2015 | $421.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2015 | 01/10/2015 | $436.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2015 | 01/09/2015 | $436.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2015 | 01/08/2015 | $429.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2015 | 01/07/2015 | $438.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2015 | 01/06/2015 | $424.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2015 | 01/05/2015 | $428.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2015 | 01/04/2015 | $451.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2015 | 01/03/2015 | $488.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2015 | 01/02/2015 | $515.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2014 | 01/01/2015 | $530.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2014 | 01/12/2014 | $541.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2014 | 01/11/2014 | $546.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2014 | 01/10/2014 | $552.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2014 | 01/09/2014 | $555.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2014 | 01/08/2014 | $562.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2014 | 01/07/2014 | $558.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2014 | 01/06/2014 | $566.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2014 | 01/05/2014 | $571.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2014 | 01/04/2014 | $563.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2014 | 01/03/2014 | $555.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2014 | 01/02/2014 | $552.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2013 | 01/01/2014 | $558.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2013 | 01/12/2013 | $560.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2013 | 01/11/2013 | $545.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2013 | 01/10/2013 | $521.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2013 | 01/09/2013 | $500.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2013 | 01/08/2013 | $500.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2013 | 01/07/2013 | $512.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2013 | 01/06/2013 | $523.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2013 | 01/05/2013 | $525.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2013 | 01/04/2013 | $515.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2013 | 01/03/2013 | $525.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2013 | 01/02/2013 | $535.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2012 | 01/01/2013 | $540.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2012 | 01/12/2012 | $528.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2012 | 01/11/2012 | $510.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2012 | 01/10/2012 | $510.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2012 | 01/09/2012 | $528.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2012 | 01/08/2012 | $547.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2012 | 01/07/2012 | $571.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2012 | 01/06/2012 | $564.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2012 | 01/05/2012 | $558.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2012 | 01/04/2012 | $559.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2012 | 01/03/2012 | $552.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2012 | 01/02/2012 | $546.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2011 | 01/01/2012 | $534.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2011 | 01/12/2011 | $533.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2011 | 01/11/2011 | $524.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2011 | 01/10/2011 | $522.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2011 | 01/09/2011 | $536.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2011 | 01/08/2011 | $549.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2011 | 01/07/2011 | $546.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2011 | 01/06/2011 | $520.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2011 | 01/05/2011 | $476.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2011 | 01/04/2011 | $435.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2011 | 01/03/2011 | $418.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2011 | 01/02/2011 | $416.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2010 | 01/01/2011 | $426.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2010 | 01/12/2010 | $438.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2010 | 01/11/2010 | $446.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2010 | 01/10/2010 | $498.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2010 | 01/09/2010 | $501.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2010 | 01/08/2010 | $496.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2010 | 01/07/2010 | $486.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2010 | 01/06/2010 | $473.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2010 | 01/05/2010 | $466.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2010 | 01/04/2010 | $464.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2010 | 01/03/2010 | $458.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2010 | 01/02/2010 | $454.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2009 | 01/01/2010 | $458.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2009 | 01/12/2009 | $459.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2009 | 01/11/2009 | $469.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2009 | 01/10/2009 | $450.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2009 | 01/09/2009 | $439.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2009 | 01/08/2009 | $416.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2009 | 01/07/2009 | $405.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2009 | 01/06/2009 | $411.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2009 | 01/05/2009 | $423.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2009 | 01/04/2009 | $463.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2009 | 01/03/2009 | $512.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2009 | 01/02/2009 | $592.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2008 | 01/01/2009 | $653.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2008 | 01/12/2008 | $722.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2008 | 01/11/2008 | $763.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2008 | 01/10/2008 | $779.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2008 | 01/09/2008 | $743.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2008 | 01/08/2008 | $692.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2008 | 01/07/2008 | $632.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2008 | 01/06/2008 | $593.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2008 | 01/05/2008 | $573.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2008 | 01/04/2008 | $569.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2008 | 01/03/2008 | $550.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2008 | 01/02/2008 | $532.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2007 | 01/01/2008 | $498.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2007 | 01/12/2007 | $498.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2007 | 01/11/2007 | $423.00 |
Alternative Maximum STEM Price | $/MWh | 01/09/2007 | 01/10/2007 | $422.00 |
Alternative Maximum STEM Price | $/MWh | 01/08/2007 | 01/09/2007 | $419.00 |
Alternative Maximum STEM Price | $/MWh | 01/07/2007 | 01/08/2007 | $413.00 |
Alternative Maximum STEM Price | $/MWh | 01/06/2007 | 01/07/2007 | $402.00 |
Alternative Maximum STEM Price | $/MWh | 01/05/2007 | 01/06/2007 | $385.00 |
Alternative Maximum STEM Price | $/MWh | 01/04/2007 | 01/05/2007 | $380.00 |
Alternative Maximum STEM Price | $/MWh | 01/03/2007 | 01/04/2007 | $380.00 |
Alternative Maximum STEM Price | $/MWh | 01/02/2007 | 01/03/2007 | $393.00 |
Alternative Maximum STEM Price | $/MWh | 01/01/2007 | 01/02/2007 | $408.00 |
Alternative Maximum STEM Price | $/MWh | 01/12/2006 | 01/01/2007 | $437.00 |
Alternative Maximum STEM Price | $/MWh | 01/11/2006 | 01/12/2006 | $464.00 |
Alternative Maximum STEM Price | $/MWh | 01/10/2006 | 01/11/2006 | $484.00 |
Alternative Maximum STEM Price | $/MWh | 21/09/2006 | 01/10/2006 | $480.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/11/2012 | 01/12/2012 | $528.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/10/2012 | 01/11/2012 | $510.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/09/2012 | 01/10/2012 | $510.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/08/2012 | 01/09/2012 | $528.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/07/2012 | 01/08/2012 | $547.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/06/2012 | 01/07/2012 | $571.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/05/2012 | 01/06/2012 | $564.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/04/2012 | 01/05/2012 | $558.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/03/2012 | 01/04/2012 | $559.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/02/2012 | 01/03/2012 | $552.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/12/2011 | 01/01/2012 | $534.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/11/2011 | 01/12/2011 | $533.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/10/2011 | 01/11/2011 | $524.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/09/2011 | 01/10/2011 | $522.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/08/2011 | 01/09/2011 | $536.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/07/2011 | 01/08/2011 | $549.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/06/2011 | 01/07/2011 | $546.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/05/2011 | 01/06/2011 | $520.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/04/2011 | 01/05/2011 | $476.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/03/2011 | 01/04/2011 | $435.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/02/2011 | 01/03/2011 | $418.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/01/2011 | 01/02/2011 | $416.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/12/2010 | 01/01/2011 | $426.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/11/2010 | 01/12/2010 | $438.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/10/2010 | 01/11/2010 | $446.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/09/2010 | 01/10/2010 | $498.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/08/2010 | 01/09/2010 | $501.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/07/2010 | 01/08/2010 | $496.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/06/2010 | 01/07/2010 | $486.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/05/2010 | 01/06/2010 | $473.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/04/2010 | 01/05/2010 | $466.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/03/2010 | 01/04/2010 | $464.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/02/2010 | 01/03/2010 | $458.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/01/2010 | 01/02/2010 | $454.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/12/2009 | 01/01/2010 | $458.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/11/2009 | 01/12/2009 | $459.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/10/2009 | 01/11/2009 | $469.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/09/2009 | 01/10/2009 | $450.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/08/2009 | 01/09/2009 | $439.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/07/2009 | 01/08/2009 | $416.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/06/2009 | 01/07/2009 | $405.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/05/2009 | 01/06/2009 | $411.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/04/2009 | 01/05/2009 | $423.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/03/2009 | 01/04/2009 | $463.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/02/2009 | 01/03/2009 | $512.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/01/2009 | 01/02/2009 | $592.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/12/2008 | 01/01/2009 | $ 653.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/11/2008 | 01/12/2008 | $722.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/10/2008 | 01/11/2008 | $763.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/09/2008 | 01/10/2008 | $779.00 |
Non-compliance cost (see WEM Rule 9.10 A.2) | $/MWh | 01/08/2008 | 01/09/2008 | $743.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/07/2008 | 01/08/2008 | $692.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/06/2008 | 01/07/2008 | $632.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/05/2008 | 01/06/2008 | $593.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/04/2008 | 01/05/2008 | $573.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/03/2008 | 01/04/2008 | $569.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/02/2008 | 01/03/2008 | $550.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/01/2008 | 01/02/2008 | $532.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/12/2007 | 01/01/2008 | $498.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/11/2007 | 01/12/2007 | $498.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/10/2007 | 01/11/2007 | $423.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/09/2007 | 01/10/2007 | $422.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/08/2007 | 01/09/2007 | $419.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/07/2007 | 01/08/2007 | $413.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/06/2007 | 01/07/2007 | $402.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/05/2007 | 01/06/2007 | $385.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/04/2007 | 01/05/2007 | $380.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/03/2007 | 01/04/2007 | $380.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/02/2007 | 01/03/2007 | $393.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/01/2007 | 01/02/2007 | $408.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/12/2006 | 01/01/2007 | $437.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/11/2006 | 01/12/2006 | $464.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 01/10/2006 | 01/11/2006 | $484.00 |
Non-compliance cost (see WEM Rule 9.10A.2) | $/MWh | 21/09/2006 | 01/10/2006 | $480.00 |
This document is published in accordance with Market Rules 10.5.1 (e) and 10.5.1 (vA).